Comparing Contractor Bids on the Same Scope of Work

Two bids for “the kitchen and both baths” are not comparable unless both contractors priced the same list of work. Before looking at the totals, check that each bid answers the same numbered lines of your scope of work. Then adjust for what is missing and for how long each contractor expects to take. This helper does that adjustment for two bids at a time; repeat it if you have a third.

Normalise before you compare

Go through each bid line by line and mark three things: items the bid excludes that your scope includes, allowances that differ from the amounts you specified, and conditions such as “permits by owner” or “debris removal not included”. Put a price on every gap, even a rough one, so the two totals describe the same finished house.

Adjusted totals: –

Schedule weeks are only worth what the contractor’s track record says they are; ask how the last few jobs finished against their estimates.

A comparison sheet for the parts the numbers miss

QuestionBid ABid B
Priced line by line against your numbered scope?☐ yes ☐ no☐ yes ☐ no
Who pulls permits and schedules inspections?
Draw schedule tied to completed work, not dates?☐☐
Change orders priced and signed before work?☐☐
Lien waivers offered with each draw?☐☐
Licensed trades named for electrical, HVAC and plumbing?
Proof of insurance seen, not just mentioned?☐☐
Warranty on workmanship, in writing?

Licences and registrations to check

Texas has no statewide licence for general contractors, so a general contractor’s qualifications come down to references, insurance, any city registration, and the licences of the trades they hire. Electricians and air conditioning and refrigeration contractors are licensed by the Texas Department of Licensing and Regulation, which offers a public search; plumbers need a Texas state plumbing licence. Ask each bidder which licensed trades will do that work and check the names yourself. If the house was built before 1978 and the job disturbs painted surfaces, the firm should be certified under the EPA Renovation, Repair and Painting rule.

When the cheaper bid is not cheaper

The adjusted total above often reverses the order of the quoted totals. A low bid with exclusions and a long schedule can cost more than a higher, complete and faster one, before counting the risk of a contractor who underbid and later needs change orders to make the job pay. None of this makes the higher bid right by default: the point is to compare like with like, then decide.

This helper is general education. It does not vet any contractor, and a written contract reviewed by your own attorney is what actually protects you.

Sources and further reading

  • Texas Department of Licensing and Regulation (TDLR) — licenses electricians and air conditioning and refrigeration contractors, with an online licence search.
  • U.S. Environmental Protection Agency — Lead Renovation, Repair and Painting (RRP) Rule for work that disturbs paint in homes built before 1978.
  • Federal Trade Commission — consumer guidance on real estate and home-improvement scams.