Q&A: Permits on a Renovate-and-Resell Project

Permits feel like friction on a project with a ticking holding clock. They are also one of the items a buyer’s inspector, appraiser or agent may ask about, and an open or missing permit can stall a sale. These answers are general; the rules that actually apply come from your city or county.

Before work starts

Which work usually needs a permit?

Typically structural changes, additions, new or relocated plumbing, electrical circuits and panels, HVAC replacement, water heaters, roofs in some cities and fences or driveways in others. Painting, flooring and cabinet swaps often do not. Many Texas cities adopt the International Residential Code with local amendments, so the list differs from city to city. Call the building department or read its permit guide.

Who pulls the permit?

Often the licensed trade for its own work: an electrician licensed by TDLR for electrical permits, a plumber with a Texas state plumbing licence for plumbing permits, a TDLR-licensed air-conditioning contractor for HVAC. Some cities let a homeowner pull certain permits, but an investor who does not live in the house may not qualify. Ask the city before assuming.

Does Texas license general contractors?

There is no statewide general-contractor licence in Texas. Some cities require contractor registration, and the licensed trades still need their state licences. That makes checking each trade more important, not less.

During and after the work

What is a “final” and why does it matter?

A final inspection closes the permit. A permit left open after the work is done can show up when a buyer or title company asks, and some cities will not issue a new permit at the address until old ones are closed.

Does lead paint change anything?

For houses built before 1978, work that disturbs painted surfaces falls under the EPA Renovation, Repair and Painting rule, which requires certified firms and lead-safe work practices. This applies whether or not your city requires a building permit for the job.

The house came with unpermitted work from a previous owner. What now?

Options include applying for a permit after the fact, opening walls so an inspector can see the work, or removing and redoing it. Whatever you decide, think about what you now know and what your seller’s disclosure should say. A Texas real estate attorney can help with the wording.

Can I skip the permit and disclose it instead?

Disclosure does not make unpermitted work safe or insurable, and it gives buyers a reason to discount the price or walk away. Appraisers and lenders may also react to rooms or systems that do not match public records.

A permit log to keep

Work itemPermit needed?Pulled byFinal passed (date)
Electrical panelCheck with cityLicensed electrician 
Water heaterCheck with cityLicensed plumber 
HVAC replacementCheck with cityLicensed A/C contractor 
Bathroom wall removalCheck with cityContractor of record 

Sources and further reading

  • International Code Council — International Residential Code (IRC), adopted with local amendments by many cities.
  • Texas Department of Licensing and Regulation (TDLR) — licenses electricians and air conditioning and refrigeration contractors, with an online licence search.
  • U.S. Environmental Protection Agency — Lead Renovation, Repair and Painting (RRP) Rule for work that disturbs paint in homes built before 1978.
  • Texas Property Code §5.008 — the seller’s disclosure notice required on most sales of residential property.